EasyManuals Logo
Home>TCL>Refrigerator>TRF-275W

TCL TRF-275W User Manual

TCL TRF-275W
31 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #16 background imageLoading...
Page #16 background image
Schematic diagram for welding of pipelines in compressor compartment:
Intubation of process
tube (copper and copper)
Connection between the
outlet of the dry filter and
the capillary tube (copper
and copper)
Connection between the
dew removable tube and
the dry filter (steel and
copper)
Connection between the outlet of the
return-air duct and the return-air
transition duct (copper and copper)
Connection between the
outlet of the evaporation
coil and the inlet of the
condenser (steel and steel)
Connection between the
compressor exhaust and
the inlet of the
evaporation coil (copper
and steel)
Welding position
of process tube

Other manuals for TCL TRF-275W

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the TCL TRF-275W and is the answer not in the manual?

TCL TRF-275W Specifications

General IconGeneral
BrandTCL
ModelTRF-275W
CategoryRefrigerator
LanguageEnglish

Related product manuals