EasyManua.ls Logo

Teac A-1250 - Threading the Tape; Loading Supply Reel; Loading Empty Reel; Tape Path Routing

Teac A-1250
24 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Threading the
Tape
)
Place
lull
reel
.a
onto
the
lelt
reel
turntable
shaft
b
so
that
the tape unwinds
in the
counterclockwise
rotation'
In doing
so,
engage
the
three
notches
d
at
the center
of
the reef
with
the three
protrusions
q
at
the
bottom
of
the shaft and
press
reel
firmly
onto
turntable
g.
lnstall
reel
clamp
.t--
onto
the
lelt reel
shaft
.b-r
to secure
the reel.
Secure
end
of tape
onto
empty
reel
(5,1
.
Insert
the end of
the
tape
into
the notch
on
the reel
while
holding
it
against
the
reel
with
your
fingers
and
wind
tape 2
or 3
times
onto
the
reel
hub
-o-l
.
Install
reel
clamp
t)
onto the
right
reel
,nug
r-Bi'
to firmly
hold
down
the empty
reel.
In doing
so,
be careful
not to
pinch
the end
of
tape
with
the clamp.
While
holding
the left
reel
'.4r
so
it
will not
move,
rotate
the right
reel
tlt
counterclockwise
to take
up
slack
in the
tape.
The
slack
should
be
taken up
sulficiently
to
bring
the shut
off
lever
P
to
its limit
to the
left'
After
these
procedures,
set the
switch
lever, below
the
tape
transport
buttons,
to
PLAY and
the tape
deck is
now
ready
to
start
at
any
time
by
depressing
the
t-> button.
@
CI
t
3
4
Place
an empty
reel .hr
on
the
right
reel
shaft
g
Pull
tl're
.nO
of
tape
with
your
fingers
and
through
each
part in
the
order
shown
below'
thread
it
1) Tension
arm
O.
2) Lower
side
of
guide post
Q.
3)
Over
the
front
faces
of the
head
assembly
(f
.
4)
Between
capstan
fD
and
pinch roller
@
.
5) Over
the
lower
side of
the tape
guide
@
on
the
shut
off
lever.
*4$

Related product manuals