7. DAILY OPERATION
7.1 INPUT POWER TO OPERATE
1) Turn on the machine power switch.
2) Visually check the game and confirm the display can work
properly.
3) Check the sound if it is ok.
4) confirm the coin mech , operation of the direction and
the machine movement is normal
Warning:Before operation, please confirm all the items
above are ok.
7.2 CHECK AFTER OPERATION
1) Check the display of the game and confirm it is proper.
2) Double check the coin mech, operation of the direction
and the machine movement is normal; If it has any problems,
please solve the problem as soon as possible.
7.3 COLLECT COINS AND KEEP RECORD
1) Switch off the power and open the door of the coin box
to take out the coins
2) Open the door of the coin mech to keep a record of the