MAINTENANCE INSTRUCTIONS TEEJET TECHNOLOGIES
98-01580-EN-R0_A4LT-E-ChemSaver-MaintenanceInstructions-TB.docx
Internal Inspection
After any inspection, reassamble all the parts as shown in the Solenoid Disassembly and Reassembly instructions referred in this bulletin.
Inspection Area Procedure Example
Coil Assembly (2)
If any external body was present in
the stainless-steel tube, clean using
dry, forced air.
Clean and Proper Dirty
O-Ring (9) Observe that the O-ring is well well-
maintained. In case of degradation,
replace it.
Proper O-Ring
O-Ring (8)
Observe that the O-ring is well well-
maintained. In case of degradation,
replace it.
Interface Cap (7) Clean using clear water. Do not use
any tool. In case of need, a
paintbrush can be use as well as
pressurized air.
Blocked or Plugged Holes
Tube Sub-Assembly (3)
Internal
If any solid is present, clean with
water.
Dirty Clean