EasyManuals Logo

Tektronix DPO7104C Printable Help

Tektronix DPO7104C
920 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #245 background imageLoading...
Page #245 background image
Start Link Training
To start Link Training do the following steps:
1. From the Menu Bar select Analyze > Link Training.
2. Press the Arm button.
3. Start Link Training on the device under test (DUT).
Starting Link Training on the DUT is DUT-specific, but is typically done from a command line console program.
LinkTraining
DPO70000SX, MSO/DPO70000DX, MSO/DPO70000C, DPO7000C, and MSO/DPO5000B Series 213

Table of Contents

Other manuals for Tektronix DPO7104C

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Tektronix DPO7104C and is the answer not in the manual?

Tektronix DPO7104C Specifications

General IconGeneral
BrandTektronix
ModelDPO7104C
CategoryTest Equipment
LanguageEnglish

Related product manuals