1.7 Essential information
1.7.1 Installer
At the point of installation, it is important to match the Asset ID to the OSID. The installer
must confirm the correct operation of the Power On / DIM / Off test cycle as follows:
1) Turn ON the mains supply to the Telecell. The lamp will illuminate for 50
seconds, then turn OFF. If the unit is fitted with a dimming unit it will illuminate
for 50 seconds but after approximately 25 seconds it will DIM to approximately
50%.
Note: When powered up, the unit may switch ON then momentarily switch
OFF, this operation is normal and is the Telecell auto-sensing between
Analogue and DALI.
2) After 50 seconds has elapsed the lamp will turn OFF.The test is now
complete. There is an issue if the lamp fails to operate as described.