EasyManua.ls Logo

Telkonet Aida - Chapter 2: Installation; Voltage Options-Summary

Telkonet Aida
25 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Chapter 2: Installation
VOLTAGE OPTIONS-SUMMARY
High Voltage Installation Option
(30 V or greater)
Low Voltage Installation Option
There is only one installation option:
1. JBox with Vertical Mud Ring Mount:
requires adapter plate as shown in
FIGURE 3.
There are 3 options. Select based on code
and desired look:
1. Drywall mount: no conduit required;
no JBox adapter plate required.
2. JBox with Vertical Mud Ring Mount:
requires adapter plate .
3. JBox with Horizontal Mud Ring
Mount.
Chapter 2: Installation 4
Aida IOM

Related product manuals