EasyManua.ls Logo

Telkonet Aida - Installation - Low Voltage (Class 2)

Telkonet Aida
25 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
INSTALLATION - LOW VOLTAGE (CLASS 2)
Always ensure power has been turned off before starting installation.
1. Turn off power at the Aida mounting location using a disconnect switch or
breaker lockout/tag out on appropriate breaker panel.
2. Test that power is off by using a voltmeter.
3. Remove the safety screw from the left side of the thermostat using the hex
wrench.
4. Separate the back plate from the thermostat: Use a flathead screwdriver to
GENTLY press the tab next to the screw hole to allow the thermostat to pop
open. WARNING: Using too much force can break the tab.
5. For drywall mounting instructions, see below. For JBox vertical installation
instructions: See JBox Using Vertical Mud Ring Instructions on page 15
DRYWALL MOUNTING INSTRUCTIONS (LOW VOLTAGE)
NOTE: Requires four 50 lb. EZ-Lock anchors and screws
6. Strip the LINE wire back 0.25 inches.
7. Cap the LINE wire with a wire nut or electrical tape.
8. Cut the COMMON wire so the copper is flush with the insulation.
9. Strip all wires except for COMMON back 0.25 inches.
10. Verify the wiring now looks similar to this:
FIGURE 2-1: Drywall Mount Wiring
11. Ensure the appropriate wires are jumped between R and SW2 (assuming they
are controlling all fan and modes from the same voltage as powering the
Chapter 2: Installation 14
Aida IOM

Related product manuals