RISK ASSESSMENT
QPP147 Appendix 1 Rev. March 07
WORKING ENVIRONMENT (SITE) CHECKLIST
Before commencing work at a site, it is recommended that the user should carry out a risk assessment for
the worksite. This checklist is provided for guidance only. Due to the variety of working environmental
conditions, this checklist is not exhaustive. If there are other hazards, please list them on a separate sheet,
and decide on the risk control measures to be introduced.
Site Address:…………………………………………………………………………………………………...
Are the Risk Control Measures
Adequate?
Site Conditions that May Increase
Risk of Accident
YES NO
Improvements Required
1. Is the ground stable?
2. Is the ground slope
excessive?
3. Is the weather too windy, wet
or foggy, or near thunder
clouds?
4. Are there buried water
mains, gas mains, electrical
cables, undetonated
explosives or any other
objects?
5. Is the working area
controlled (from pedestrians
and other traffic)?
6. Is visibility of work area
adequate?
7. Are there overhead power
lines or high-power
electromagnetic wave
emitters near working area?
8. Are there falling stones,
rubble or other objects?
9. Is the working area too close
to drops and road shoulders?
10. Others?
Site Assessed by: ................................................................................................................
(Name & Date)