EasyManua.ls Logo

Textron Bell 412 - Page 130

Textron Bell 412
288 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
BHT-412-MM-2
5-00-00
Page 94 Rev. 16 26 FEB 2013
Export Classification C, ECCN EAR99
AFTER COMPLETION OF INSPECTION
1. Reinstall all panels, fairings, and cowlings removed during
inspection.
2. Carry out a ground run and leak check prior to releasing
the helicopter back to service.
FUSELAGE
Chapter 25 1. Emergency and safety equipment:
a. Emergency and safety equipment for inspection due
dates.
b. Contents of first aid kit for missing or over age items.
Chapter 26 2. Perform weight check of cockpit and cabin portable fire
extinguishers.
Chapter 52 3. Perform operational check of crew doors emergency
release mechanisms.
Chapter 21
Chapter 96
4. Bleed air heating and ventilation/defog system
components:
a. Perform functional check of bleed air heating system
and components.
b. Perform functional check of defog blower.
Chapter 95 5. Instruments: (required at 12 months calendar time only)
a. Calibrate pilot, copilot compass systems, and standby
magnetic compass.
b. Drain pitot-static system of any accumulated moisture.
c. Test pitot-static system for leaks.
Chapter 96 6. Perform functional check of battery temperature sensor
caution light system.
SCHEDULED INSPECTIONS
5-11. 600 HOUR/12 MONTH INSPECTION — PART B (CONT)
DATA REFERENCE INSPECTION TASK DESCRIPTION
INITIAL
MECH OTHER

Table of Contents

Related product manuals