EasyManua.ls Logo

Textron Bell 412 - 5-27 A. EACH 24 MONTHS OF MAIN ROTOR MAST OPERATION; MAIN ROTOR MAST ASSEMBLY (412-040-366-SERIES AND 412-040-368-SERIES)

Textron Bell 412
288 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
BHT-412-MM-2
5-00-00
Export Classification C, ECCN EAR99
SCHEDULED INSPECTIONS
5-27A. EACH 24 MONTHS OF MAIN ROTOR MAST OPERATION
DATA REFERENCES INSPECTION TASK DESCRIPTION
INITIAL
MECH OTHER
Accomplish every 24 months of main rotor mast
operation when operating in a non-corrosive
environment. If helicopter is operated in a corrosive
environment, it is recommended this inspection be
accomplished every 12 months.
MAIN ROTOR MAST ASSEMBLY (412-040-366-SERIES
AND 412-040-368-SERIES)
Chapter 62 1. Remove main rotor hub assembly.
BHT-412-CR&O
Chapter 63
2. Clean then visually inspect main rotor mast upper splines
for corrosion.
Chapter 62 3. Install main rotor hub assembly.
01 JUN 2018 Rev. 26 Page 150A/150B

Table of Contents

Related product manuals