The Land of Nod
8135 River Drive Morton Grove, IL 60053p: (800) 933-9904 e: customerservice@landofnod.com www.landofnod.com
Geodome Playhouse Assembly Instructions
Page 1 of 7
Made in China - r04
This page lists the contents included in the box.
Please take time to identify the hardware as well as
the individual components of the product. As you
unpack and prepare for assembly, place the
contents on a carpeted or padded area to protect
them from damage. Please follow the assembly
instructions closely. Improper assembly can result
in personal or property damage.
Note: 2 adults are required to safely assemble
this product.
1 - Pole cover1 - Fabric cover
19 - Pole A
2 - Pole B
33 - Pole C
12 - Pole D
9 - Pole E
10 - Pole F
10 - Pole G
6 - Connector #3 18 - Connector #4
2 - Connector #5
2 - Connector #1 9 - Connector #2
A
D
E
F
G
C
B
5
43
2
1
Question and Answer IconNeed help?

Do you have a question about the The Land of Nod Geodome Playhouse and is the answer not in the manual?

The Land of Nod Geodome Playhouse Specifications

General IconGeneral
BrandThe Land of Nod
ModelGeodome Playhouse
CategoryIndoor Furnishing
LanguageEnglish

Summary

Step 1: Assemble Pole Lines

Assemble Straight Pole Lines

Assemble the first straight line with 4 pole A and 1 pole B, secured by connector #2. Assemble the second straight line with 5 pole A and 1 pole B, secured by connector #1 and connector #2.

Step 2: Connect Pole Assemblies

Connect Pole Lines

Attach the 1st and 2nd straight pole assemblies using connector #1 and connector #2. Ensure poles bend to fit connectors.

Step 3: Add Outer Poles and Connectors

Assemble and Secure Outer Poles

Assemble 18 pole C and 2 pole D, securing them with 8 connector #4 and 2 connector #5.

Step 4: Integrate Inner Poles

Assemble Inner Pole Structure

Assemble 10 pole A, 10 pole C, 9 pole E, and 10 pole F, securing with 5 connector #3, 9 connector #4, and 2 connector #5.

Step 5: Add Final Poles

Assemble Final Pole Structure

Assemble 5 pole C, 10 pole D, and 10 pole G, securing with 6 connector #3 and 10 connector #4.

Step 6: Geodome Frame Assembly Complete

Step 7: Attach Covers and Finalize

Finalize Playhouse with Covers

Pull fabric cover over frame, attach pole cover, and secure with hook and loop closures.