Installation Guide
Domestic heat pumps
Atria Optimum
Atria Duo Optimum
Comfort Optimum
Diplomat
Diplomat Duo
Diplomat Duo Optimum
Diplomat Duo Optimum G2/G3
Diplomat Optimum
Diplomat Optimum G2/G3
www.thermia.com
Question and Answer IconNeed help?

Do you have a question about the Thermia Diplomat Duo Optimum G3 and is the answer not in the manual?

Thermia Diplomat Duo Optimum G3 Specifications

General IconGeneral
BrandThermia
ModelDiplomat Duo Optimum G3
CategoryHeat Pump
LanguageEnglish

Summary

2 Important information/Safety regulation

2.1 General safety precautions

Provides essential safety precautions for installation, operation, and maintenance.

2.3 Electrical connection

Guidelines and warnings for connecting the electrical power supply.

2.5 Commissioning

Critical cautions and steps to be followed before commissioning the unit.

3 Transport, unpacking and setting-up

3.1 Transporting the heat pump

Safety guidelines for transporting the heat pump to prevent damage.

3.3 Setting-up the heat pump

Recommendations for indoor installation location and space requirements.

3.4 Setting-up the outdoor unit

Guidance on optimal placement and setup of the outdoor unit.

4 Heat pump data, dimensions and connections

4.1 Diplomat, Diplomat Optimum, Diplomat Optimum G2/G3, Comfort, Comfort Optimum

Technical specifications, dimensions, and connection points for specific models.

Diplomat Duo, Diplomat Duo Optimum, Diplomat Duo Optimum G2/G3

Technical specifications, dimensions, and connection points for specific models.

Atria Optimum

Technical specifications, dimensions, and connection points for the Atria Optimum model.

5 Piping installation

5.1 Safety valves

Requirements and guidelines for installing safety valves in the system.

5.2 Connection heating and hot water

Instructions for correctly connecting heating and hot water pipes.

5.3 Connection brine

Details and diagrams for connecting the brine system.

6 Electrical Installation

6.3 Connecting external supply voltage

Instructions for connecting the external power supply to the unit.

6.7 Selection of system solution and connection of external aux. heater

Overview of selecting system solutions and connecting external auxiliary heaters.

9 SERVICE menu

9.4 Sub-menu MANUAL TEST

Menu for performing manual tests on various heat pump functions.

10 Commissioning

10.1 Checking the pipes and electrical installation

Pre-commissioning checks for piping and electrical connections.

10.3 Filling and bleeding the water heater and heating system

Detailed steps for filling and bleeding the water heater and heating system.

10.4 Filling and bleeding the brine system

Procedures for filling and bleeding the brine system, including anti-freeze.

10.5 Manual test

Procedures for performing manual operational tests on the heat pump.

10.6 Commissioning

Final steps and checks to commission the installed heat pump.

Related product manuals