SYSTEM CHECK LIST
All unit mounting hardware torqued to specifications.
No air gaps between unit and trailer wall.
Drain hose properly routed and secured.
Fuel tank properly installed.
Fuel lines properly routed and fuel fittings tightened securely.
Bulkhead properly designed and installed.
Battery secured correctly and all connections clean and tight.
Remote HMI mounted securely.
Run Pre-Trip Inspection (refer to Operators Manual).
Run unit under load for eight hours to properly break-in engine.
Release to customer.