Do you have a question about the Thermo Scientific TRACE 1310 and is the answer not in the manual?
Brand | Thermo Scientific |
---|---|
Model | TRACE 1310 |
Category | Laboratory Equipment |
Language | English |
Describes the TRACE 1310 Auxiliary Oven's purpose and placement.
Details necessary clearances and pathways for equipment delivery.
Specifies workspace dimensions, load capacity, and clearances.
Outlines necessary illumination for the work area.
Lists electrical specifications and needs for the system.
Defines network connectivity needs for data systems.
Specifies operational conditions like temperature, humidity, and pollution.
Details necessary ultra-high purity GC gas supplies.
Provides guidelines for inspecting and handling delivered equipment.
Outlines post-delivery steps and installation scheduling.
Describes components and features visible on the front panel.
Details components located on the top surface of the oven.
Identifies ports, fans, and connectors on the rear panel.
Shows components on the right side, including the main oven.
Describes the left side and its connection to the main GC.
Explains the interior layout, divided into heated/unheated compartments.
Details main oven, optional secondary oven, and methanizer.
Describes valve configurations within the unheated section.
Focuses on the primary oven compartment and its valve capacity.
Illustrates the placement of various instrument labels.
Lists required tools for component installation.
General guide for installing and configuring valves.
Procedures for installing valves in the heated section.
Step-by-step guide for needle valves and fittings.
Instructions for installing high-temperature connectors.
Procedure for fitting rotary valves into the main oven.
Steps for installing diaphragm valves in the main oven.
Instructions for components in the unheated section.
Guide for needle valves/fittings in the unheated area.
Procedure for unheated rotary valve installation.
Steps for unheated diaphragm valve installation.
Guide for liquid sample valve installation.
Instructions for installing gas modules.
Details on using gas modules for split flow control.
Guide for installing auxiliary detector components.
Instructions for mounting the secondary oven.
Procedure for installing the methanizer unit.
Steps for connecting the heated transfer line.
Instructions for electrical connections between units.
Procedures for physically connecting the oven to the GC.
Guide for configuring and operating via the GC touch interface.
Instructions for operation using Chromatography Data Systems.
Important initial information and warnings for maintenance.
Lists necessary items for routine upkeep.
Steps for safely starting the instrument.
Procedures for powering off the system.
Guidelines for exterior cleaning.
Instructions for changing the column.
Procedures for methanizer upkeep.
Guidance for resolving common operational issues.
Method for detecting leaks in the system.
Addresses issues with valve operation.
Verifies correct valve and system connections.
Diagnoses and resolves methanizer issues.