EasyManuals Logo

Thomson Power Systems TSC 900 User Manual

Default Icon
61 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #55 background imageLoading...
Page #55 background image
APPENDIX “B”
THOMSON POWER SYSTEMS
©
TS 970 SYSTEM VOLTAGE CHANGE
PROCEDURE
4916 - 275th Street, Langley, BC, Canada V4W 0A3 · Telephone (604) 888-0110
Email: info@thomsonps.com · www.thomsonps.com
CAUTION: Brace PT terminal block with your hand when loosening or tightening ANY screws.
6. Remove the screw and red ring terminal connected to the incorrect (existing) PT
voltage terminal. Install the screw and red ring terminal to the new selected PT Tap
Terminal based on required voltage and tighten while supporting the terminal block.
Make sure the ring terminal is not misaligned or the PT cover will not fit back on.
7. Install the extra screw back onto the old PT location and tighten.
CAUTION
Confirm that PT screws are correctly tightened, and do not put strain
on the PT Tap wires.
8. Replace the PT cover. PT covers should 'snap' in place, confirm they are installed
correctly by gently "twisting" the PT cover. DO NOT use excessive force.
9. Repeat the steps 1 to 5 for all Potential Transformers.
NOTE: 2 to 3 PT’s will be installed in the Transfer Switch depending on the Model
type.

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Thomson Power Systems TSC 900 and is the answer not in the manual?

Thomson Power Systems TSC 900 Specifications

General IconGeneral
BrandThomson Power Systems
ModelTSC 900
CategorySwitch
LanguageEnglish

Related product manuals