EasyManua.ls Logo

Throwdown HIIT UBE - Required Tools; Packaging Removal

Throwdown HIIT UBE
16 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Page 4
REQUIRED TOOLS
Metric Allen Key Set
Metric Open-Ended Wrench Set
Large Adjustable Crescent Wrench
PACKAGING REMOVAL:
Carefully remove all packaging materials that wrap the equipment. If parts are missing see Support
& Service
DO NOT USE A KNIFE OR BOX CUTTER AS YOU MAY DAMAGE THE EQUIPMENT.
At this time remove any sub-components from the pallet and set aside for later assembly. Once all packaging
has been removed, lay all parts out in a clean open area to prepare for assembly. Should any component not
be present or if you have any operational questions, please refer to SUPPORT & SERVICE
After assembly, a complete visual inspection, and test of the features and functions of the
assembled unit must be made prior to use.
IN THE BOX
H
F
G
A
B
E
D
C
Fig. 2
Shipped Parts
ASSEMBLY
# PN Description
A 701-0541 THROWDOWN HIIT CONSOLE KIT
B 620-9075 MANUAL, ASSEMBLY, HIIT UBE
C 718-5630 Kit, Hardware, Assembly, Airfit UB
D 720-5102 Plate, Tread, Platform, Ergo
E 720-5175-XX Assy, Bench, Seat, Ergo
F 720-5192-XX Assy, Grip, Hand, Ergo
G 720-5207-XX ASSY, PLATFORM, ERGO
H 720-5306-XX ASSY, BASE, MAIN, UBE, THROWDOWN