EasyManua.ls Logo

THUNDER TIGER mini Titan E325 - Page 15

THUNDER TIGER mini Titan E325
62 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
-13-
-14-
-15- -17--16- -19- -21-
Main Frame Assembly-4Main Frame Assembly-3Main Frame Assembly-2Main Frame Assembly-1
No.
1
2
Material No. Description Qty
1
1
(4)
(1)
(2)
(4)
(3)
BK1030
BK1018
Main frame
Base Plate
Step 1
Assemble the Main Frame and the Base Plate with 6 self-tapping screws.
Step 2
Attach the Landing Skid to the Base Plate with 4 self-tapping screws.
(4)
(3)
(1)
(2)
No.
1
2
3
4
Material No. Description Qty
1
1
1
8
HMV1150X
BK1034
BK1033
HNN2-10B
Bearing d5xD11x5t
Upper BRG Housing(left)
Upper BRG Housing(right)
Tapping Screw(W/Washer) M2x10
Step 1
Assemble the Upper BRG Housing.
Step 2
1.Slide the Upper BRG Housing into the Main Frame.
2.Fix the Upper BRG Housing with 4 self-tapping screws.
(4)
No.
1
2
3
4
5
Material No. Description Qty No.
6
7
8
9
10
Material No. Description Qty
BK1048
BK1049
BK1056
BK1057
HNN2-10B
Servo Mount(Right)
Servo Mount(Left)
Frame Spacer
Canopy Retaining Post
Tapping Screw(W/Washer) M2x10
1
1
1
2
4
HNN2-6B
BK1021
BK1022
BK1023
BK1037
Tapping Screw(W/Washer) M2x6
Battery Tray
Battery Tray Side Plate
Battery Holder
Phasing Control Track
14
1
2
1
1
Step 2
1.Attach the Battery Tray Side Frame and secure it with 4 self-tapping screws.
2.Assemble the Battery Tray onto the Base Plate and the Battery Tray Side Frame.
3.The Battery Holder is used to hold the battery when the battery is installed. You can choose
the position depending on the size of your battery.
No.
1
2
3
4
Material No. Description Qty
1
1
2
1
(3)
(4)
(2)
(1)
BK0933
BV0934
BK0931
BK0930
Autorotation Tail Drive Gear
Main Gear (W/Bearing)
Flat Washer d6xD10x0.3
One Way Bearing Shaft
One Way bearing
Words on bottom
1mm
Spacer
One Way Bearing
Main Gear 150T
Note:2
Note:1
No.
1
2
3
4
5
Material No. Description Qty
1
1
1
1
1
HMC2-14B
HML2
HME3-3B
HMV1150X
BK1020
Socket Screw M2x14
M2 Nut
Set Screw
Bearing d5xD11x5
Main Shaft Lock Ring
(1)
(2)
No.
1
2
3
4
Material No. Description Qty
BK1004
BK1073
BK0988
BK0989
Tail Boom 356mmxØ14
Belt MXL-3tx413T
Tail Unit Housing
Tail Unit Housing Cover
1
1
1
1
Step 3
Do not over tighten the M2x16 Socket Screw
so that the lever can be rotated freely.
No.
1
2
3
4
5
Material No. Description Qty
BK0990
BK0991
BV0993A
BK1091
HMV520ZZWY
No.
6
7
8
9
Material No. Description Qty
HMC2-16B
HNN2-10B
BK1203
HSP16-6N
Tail Pith Control Lever-1
Tail Pith Control Lever-2
Tail Pith Control Set
Double Joint Lever
Bearing d2xD5x2.5
Socket Screw M2x16
Tapping Screw(W/Washer) M2x10
Linkage Ball(Ø3.8)
Countersunk Screw M1.6x6
1
1
1
1
2
2
1
1
1
(6)
(3)
(1)
(7)
(2)
(8)
(9)
(5)
Step 4
Complete
Note:
No.
1
2
3
4
5
Material No. Description Qty No.
6
7
8
9
Material No. Description Qty
BK0998
HMV840ZZY
BK1000
BK0972
HMV520ZZW
BK1080
HMC2-8B
HNU2-9Z
BK0961
Tail Pitch housing
Bearing d4xD8x3
Tail Pitch Control Link
Tail Rotor Hub
Bearing d2xD5x2.5
Safty Washer
Socket Screw M2x8
Shouldered Screw M2x9
Tail Rotor blade
2
2
2
1
2
2
2
4
2
(5) (6) (7)(1)
(9)
(8)
chamfer
chamfer
No.
1
2
Material No. Description Qty
HME3-3B
HNU2-9Z
Set Screw
Shouldered Screw M2x10
1
2
No.
1
2
3
4
Material No. Description Qty
BK1085
BK1001
HNN2-6B
HNN2-10B
Stabilizer Fin
Vertical Fin
Tapping Screw(W/Washer) M2x6
Tapping Screw(W/Washer) M2x10
1
1
1
2
(2)
(2)
(1)
Step 2
Complete
T22
(7)
(3)
(6)
(6)
(5)
(4)
Mind the direction
of the satefy washer
No.
3
4
Material No. Description Qty
1
10
BK1059
HNN2-6B
Landing Skid
Tapping Screw(W/Washer) M2x6
No.
5
6
7
Material No. Description Qty
BV0973
HMV830ZZ
HNN2-10B
Tail Rotor Shaft Set
Bearing d3xD8x4t
Tapping Screw(W/Washer) M2x10
1
2
4
-18-
(6)
(4)
(7)
(6)
(5)
(1)
(3)
(8)
(2)
T22
(4)
-20-
(3)
(1)
(4)
(4)
(2)
-22-
Step 1
1.Secure the Servo Tray to the Main Frame with 6 self-tapping screws.
2.Slide the Phasing Control Track onto the Main Frame and fix it with 2 self-tapping screws.
3.Secure the Canopy Retaining Post and the Frame Spacer with CA glue.
1.The One Way Bearing and the Spacer are pre-assembled.
2.Assemble the Main Gear and the Autorotation Tail Drive Gear with the One Way Bearing
Shaft.
1.Install the Bearing into the Base Plate.
2.Slide the Main Gear Assembly into the Main Frame.
3.Slide the Main Shaft through the Upper BRG Housing, the Main Gear Assembly and the
Lower Bearing.
4.Line up the holes of the Autorotation Tail Drive Gear, the One Way Bearing Shaft and the
Main Shaft. Insert the Socket Screw and fix it with a M2 Nut. Do not forget to add some
Loctite and do not over tighten the screw.
5.Push the Main Rotor Hub downward slightly and put on the Main Shaft Lock Ring under
the Base Plate. Secure the Main Shaft Lock Ring with a Set Screw through the hole beside
the Base Plate. Make sure there is no play of the Main Shaft.
T22
(2)
(4)
(5)
(1)
(3)
Step 1
Insert the Tail Rotor Drive Belt through the Tail Boom so
that it comes out of both ends.
Step 1
1.Fit the Bearings into the Double Joint Lever.
2.Secure the Double Joint Lever to the Tail
Unit Housing.
3.Do not over tighten the M2x16 Socket Screw
so that the lever can be rotated freely.
Step 2
1.Secure the Linkage Ball to the Tail Pitch
Control Lever-1.
2.Assemble the Tail Pitch Control Levers and
the Tail Pitch Control Set.
Step 1
1.Secure the Tail Pitch Control Link to the Tail Pitch Housing. Mind the direction of the chamfer
of the Link. Do not over tighten the screw that
the Tail Pitch Control Link can be rotated freely.
2.Assemble the Tail Pitch Housing to the Tail
Rotor Hub. Be sure to apply Loctite on the
Socket Screw and mind the direction of the
Safety Washer.
Step 2
Secure the Tail Rotor Blades to the Tail Pitch Housing.
Do not over tighten the self-tapping screws
Step 1
Secure the Tail Rotor Hub Set onto the Tail Rotor
Shaft. Make sure that the Set Screw should be right
on the dot of the shaft. Do not forget apply Loctite on
the Set Screw.
Step 2
Fit the Tail Pitch Control Link to the Tail Pitch Control Set. Do not over tighten the Socket
Screw so that the tail linkage can be rotated freely.
Step 1
1.Secure the Stabilizer Fin to the Vertical Fin.
2.Secure the Vertical Fin to the Tail Unit Housing.
Step 2
1.Install the Bearing into the Tail Unit Housing.
2.Slide the Tail Unit Housing onto the Tail Boom and secure it with a self-tapping screw.
3.Slide the Tail Rotor Shaft Set into the Tail Unit Housing and place the Tail Rotor Drive Belt
over the Pulley.
4.Install the Tail Unit Housing Cover as shown.
(7)
Main Frame Assembly-5 Tail Unit Assembly-2 Tail Unit Assembly-4
Bag E Bag F Bag F Bag G Bag G Bag H Bag H Bag I Bag I Bag I
Note:
Use access
hole to tighten set screw
CA
(5)
(7)
(9)
(6)
(8)
(6)
(5)
(6)
(6)
(10)
(3)
(1)
(4)
(2)
The slot should be
at upper side

Other manuals for THUNDER TIGER mini Titan E325

Related product manuals