EasyManuals Logo

ThyssenKrupp DAF290 User Manual

ThyssenKrupp DAF290
48 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #30 background imageLoading...
Page #30 background image
OPERATING MANUAL DAF290 MAINTENANCE
ThyssenKrupp Aufzugswerke GmbH
During the pulling operation the rope clamp must not be attached to the
ropes, as otherwise there is a danger that the clamp will catch between the
rope and the traction sheave.
Important: Before putting the installation back into service, ensure that the
cause of the malfunction has been remedied and that the installation is in
proper working order.
Attaching the jack to the traction sheave
Note: Further illustrations of the additional tools required for the process can
be found in the Appendix.
Pressure arm
Rope fixing beam
Centring pin
Hydraulic jack
Lever
Drain valve
1
2
3
4
5
6
Fig. 7.8.2
30
10-2012
Product has been
replaced

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the ThyssenKrupp DAF290 and is the answer not in the manual?

ThyssenKrupp DAF290 Specifications

General IconGeneral
BrandThyssenKrupp
ModelDAF290
CategoryDC Drives
LanguageEnglish

Related product manuals