EasyManua.ls Logo

Tiger Caspian User Manual

Tiger Caspian
20 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Page #1 background imageLoading...
Page #1 background image
TIGER
CASPIAN
LOG CABIN
GENERAL ASSEMBLY
INSTRUCTIONS
TIG/INS15
Question and Answer IconNeed help?

Do you have a question about the Tiger Caspian and is the answer not in the manual?

Tiger Caspian Specifications

General IconGeneral
BrandTiger
ModelCaspian
CategoryGarden Houses
LanguageEnglish

Summary

Before You Get Started

Read Instructions Carefully

Crucial advice and checks before commencing assembly.

Timber Properties and Care

Explains timber behaviour due to weather and recommended treatments.

Building a Suitable Base

Guidance on ensuring a firm, level, and correctly sized base.

Types of Bases

Illustrates and describes suitable base construction options.

Safety and Product Information

Erection Safety Precautions

Emphasizes the need for two competent adults and safety gloves.

Manufacturer Information

Highlights UK manufacturing and FSC certification.

Pro-Installation Service

Details the optional professional installation service and contact info.

Assembly Preparation

Tools Required for Assembly

Lists essential tools not included with the kit.

Fixing Kit Contents

Details the specific screws, nails, and bolts provided.

Unpacking Cabin Components

Instructions for safely unpacking and preparing parts.

Pre-Assembly Checks

Verify Building Pack Contents

Advises checking all parts against the construct diagram and cutting list.

Important Assembly Notes

Key advice on base readiness, part condition, and installation scheduling.

Step 1: Unpacking Cabin Components

Component Organization and Placement

Guide to unpacking, organizing, and identifying logs.

Log Interlocking and Fitting

Explains log interlocking and proper tongue and groove fitting.

Step 2: Double Door Assembly

Door Frame Construction

Instructions for assembling the four door frame components.

Securing Door Frame Sections

Details on joining frame sections and fitting the door sill and head.

Step 3: Lay Down Tanalised Bearers

Bearer Positioning on Base

Guidance on placing tanalised bearers according to the floor plan.

Equal Spacing of Bearers

Instructions for spacing bearers approximately 400mm apart.

Step 4: Begin Building Walls

First Layer of Logs

Placing the initial layer of logs on the bearers, ensuring correct orientation.

Ensuring Wall Squareness

Method for checking and ensuring the cabin floor is square diagonally.

Securing Logs to Bearers

Instructions for screwing logs into the tanalised bearers.

Step 5: Securing Floor

Floorboard Placement and Gapping

Laying floorboards with specific gaps for expansion.

Temporary Floor Securing

Notes on not fully securing floorboards initially to maintain squareness.

Step 6: Continue to Build Walls

Building Walls Layer by Layer

Instructions for interlocking logs to build walls up to eaves height.

Storing Remaining Floorboards

Advice on storing floorboards to ensure they fit later.

Step 7: Install Doors & Windows

Fitting Doors and Frame

Sliding the assembled doors and frame into place.

Handling Heavy Components

Important safety note on the weight of doors and windows.

Window Installation and Gapping

Placing windows centrally and ensuring gaps for settling.

Base Stability and Squareness

Emphasizes base firmness for preventing door/window twisting.

Step 8: Install Gable Tops

Placing Gable Tops

Instructions for positioning gable tops on the eaves height logs.

Step 9: Install Purlins

Purlin Positioning and Angling

Guidance on placing purlins with angled cuts facing downwards.

Securing Purlins to Gable Tops

Details on using N65 fixings to secure purlins.

Step 10: Install Roof Boards

Checking Cabin Squareness

Verifying the cabin is square before fitting roof boards.

Roof Board Fixing Method

Instructions for fixing roof boards using N65 fixings at various points.

Apex and End Board Fitting

How to fit the apex and final roof boards, including trimming.

Step 11: Install Roof Batten and Skirting

Fixing Roof Batten

Attaching roof battens to the underside of roof boards using N40.

Attaching Skirting

Securing skirting pieces along the length with N40 fixings.

Step 12: Felt the Roof

Felt Preparation and Cutting

Rolling out and cutting felt strips with overhang.

Applying Felt to Low Side

Positioning and fixing felt on the lower roof slope.

Securing Felt with CN20

Fastening felt using CN20 fixings at specified intervals.

Overlapping and Folding Felt

Instructions for overlapping felt and folding overhangs.

Step 13: Attach Roof Fascia Boards (Bargeboards)

Fascia Board Attachment

Fixing fascia boards to the purlin and batten using N40.

Install Apex Finials

Securing finials at the apex join.

Step 14: Lay Floorboards

Floorboard Placement and Gapping

Laying floorboards with 2.5mm gaps for expansion.

Nailing Floorboards

Securing floorboards to bearers using BA40 fixings.

Cutting Last Floorboard

Instructions for trimming the final floorboard to size.

Step 15: Fixing Doors and Windows

Squaring and Securing Fascias

Checking squareness and screwing fascia boards internally/externally with S40.

Fixing Remaining Doors/Windows

Repeating the fixing process for all doors and windows.

Step 16: Install Internal Roof Battens

Attaching Internal Roof Battens

Attaching internal roof battens to top side logs with S40.

Step 17: Fit Internal Skirting

Preparing and Cutting Skirting

Fitting skirting around the internal floor edge and cutting to size.

Securing Internal Skirting

Fixing skirting sections using S40, avoiding the floorboards.

Step 18: Attach Storm Braces

Fixing Storm Braces to Gables

Attaching storm braces to the inside of gables with CB40.

Allow Slack for Expansion

Ensuring the bottom CB40 fixing is slack to allow for movement.

Related product manuals