TIGER CASPIAN LOG CABIN GENERAL INSTRUCTIONS
Step 5:
SECURING FLOOR
• Checkoorboardsarecorrectsize.Donotmixupwithroofboards.
• Lay5oorboardsinposionandtackinplace.Leaveapprox.2.5mmgapbetweentheedgeofthe
oorboardsandtheinsideofexternalwalls.
(Detail E)
NOTE: DO NOT FULLY SECURE AS THESE ARE ONLY TO KEEP THE FLOOR SQUARE WHILE BUILDING
THE LOG CABIN.*
• *Forcabinswithinternalparon,theoorboardswillneedtobefullyinstalledatthisstagetoallow
paronbaselogstobeinstalled.PleasejumptoStep14fordetails.
E
Step 6:
CONTINUE TO BUILD WALLS
• Usingconstructdiagramasaguide,begintobuildupthewallsbyinterlockingthelogslayerbylayerunl
3logshigh.
• Atthispoint,storeremainingoorboardsinsidethecabinreadyforinstallaon.Youmaynotbeabletot
oorboardsthroughthedooroncecabinhasbeenbuilt.