Tiger MALAYAN User Manual

Tiger MALAYAN
16 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Page #1 background imageLoading...
Page #1 background image
TIGER
MALAYAN
GARAGE
LOG CABIN
GENERAL ASSEMBLY
INSTRUCTIONS
TIG/INS42
Question and Answer IconNeed help?

Do you have a question about the Tiger MALAYAN and is the answer not in the manual?

Tiger MALAYAN Specifications

General IconGeneral
BrandTiger
ModelMALAYAN
CategoryGarden Houses
LanguageEnglish

Summary

Preparation and Timber Care

Timber Properties and Care

Explains how timber reacts to weather and suggests protective measures.

Base Construction Guidelines

Details requirements for a suitable and stable base for the cabin.

Required Tools

Lists essential tools needed for the assembly process.

Fixing Kit Contents

Details all the fasteners and fixings included in the kit.

Pack Contents Check

Advises checking all components against the delivery list.

Assembly Importance

Highlights key points to ensure proper and safe assembly.

Assembly Steps

Step 1: Unpacking Components

Instructions for unpacking and organizing cabin parts before assembly.

Step 2: Garage Door Frame Assembly

Assembling the main frame for the garage doors.

Step 3: Lay Down Tanalised Bearers

Positioning the base bearers on the prepared foundation.

Step 4: Begin Building Walls

Starting the construction of the cabin walls with log layers.

Step 5: Install Doors & Windows

Fitting the doors and windows into the partially built structure.

Step 6: Install Gable Tops

Installing the gable tops to form the roof structure.

Step 7: Install Purlins

Securing the purlins to the gable tops for roof support.

Step 8: Install Roof Boards

Attaching the roof boards to the purlins and structure.

Step 9: Install Roof Batten and Skirting

Fitting the roof batten and skirting for weather protection.

Step 10: Felt the Roof

Measuring, cutting, and applying the roof felt for waterproofing.

Step 11: Attach Roof Fascia Boards

Attaching the fascia boards to the roof edges.

Step 12: Fixing Doors and Windows

Final fixing of doors and windows to the completed structure.

Step 13: Install Internal Roof Battens

Installing internal battens to seal the roof and walls.

Step 14: Attach Storm Braces

Securing storm braces for structural stability against wind.