EasyManua.ls Logo

Tiger MALAYAN - Step 2: Garage Door Frame Assembly

Tiger MALAYAN
16 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Please retain instrucons for future reference
Step 2:
GARAGE DOOR FRAME ASSEMBLY
To begin with locate the metal door strip with two tanalised bearers pre-aached and the two sides of the
door frame, these will have the hinge pins pre-aached.
Lay the components out on the ground and then x the metal door strip to the sides of the door frame using
1x S60 per post.
(Detail B)
Slot the door head in to place on top of the door frame sides and x this place with 1x S60 per post.
You can then move this secon to an upright posion and lay out the other pieces of tanalised bearer as per
your construct diagram.
DOOR POST (RH)
B
S60
07
S60 S60
DOOR POST (LH)
METAL BAR

Related product manuals