EasyManua.ls Logo

Tiger Caspian - Step 10: Install Roof Boards; Checking Cabin Squareness; Roof Board Fixing Method; Apex and End Board Fitting

Tiger Caspian
20 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Pleaseretaininstruconsforfuturereference
H1 H2 H3
N65
N65
N65
Step 10:
INSTALL ROOF BOARDS
• Beforeinstallingtheroofboards,checkthatthecabinissquarebothvercally&horizontally.
Adjustifrequired.
• Posionatongue&grooveroofboardushwithpurlinatoneendofroof.
• Fixthroughapexpurlinusing2xN65perboard.
(Detail H1)
• Fixthroughoneaddionalpurlinusing2xN65perboard.(Detail H2)
• Fixthroughsidetoplogsusing2xN65perboard.(Detail H3)
• Connueworkingacrossroof,repeangthestepsabove.
• Thenalroofboardmayneedtrimmingtositushwithpurlinatend.
CRITICAL!: ALL ROOF BOARDS MUST HAVE 2X N65 PER FIXING POINT AS OUTLINED ABOVE.
Step 11:
INSTALL ROOF BATTEN AND SKIRTING
• Fixroofbaenontotheundersideofroofboardsonlowsideusing6xN40,evenlyspacedalonglength.
Finishwithapieceofskirng,aachedusing6xN40,evenlyspacedalonglength.
(Detail I1 & I2)
NOTE: ROOF BATTENS AND SKIRTING MAY COME IN MORE THAN 1 SECTION.
I2I1
N40
N40
13