EasyManua.ls Logo

Tiger KERR - ATTACH ROOF FASCIA BOARDS; Fascia Board Installation; LAY FLOORBOARDS; Final Floorboard Nailing

Tiger KERR
24 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Pleaseretaininstruconsforfuturereference
19
Step 13:
ATTACH ROOF FASCIA BOARDS (BARGEBOARDS)
• Aachrooffasciasusing4xN40perfasciaboard.Nailthroughtoppurlinandboomroofbaen.
Completethelookwithnialsoverthejoinatapex.Secureusing2xN40pernial.
NOTE: THERE ARE NO BARGEBOARDS SUPPLIED FOR LOW SIDE OF ROOF AS THIS WILL PREVENT
EFFECTIVE WATER DRAINAGE.
Step 14:
LAY FLOORBOARDS
• Starttolaytheoorboards.Thereshouldbea2.5mmgapbetweentheedgeoftheoorboardsandtheouter
logstoallowforexpansionandcontracon.
• Nailtheoorboardstothetanalisedbearersbelowwith2xBA40evenlyspacedperoorboardper
tanalisedbearer.
• Thelastboardwillneedcungdowntosize.Ifinstallinganyparons,pleasereturntoStep6.
FASCIA
FASCIA
FINIAL
CUT FLOORBOARD TO SIZE

Related product manuals