TIGER RAYNER LOG CABIN GENERAL INSTRUCTIONS
Step 5:
SECURING FLOOR
• Checkoorboardsarecorrectsize.Donotmixupwithroofboards.
• Lay5oorboardsinposionandtackinplace.Leaveapprox.2.5mmgapbetweentheedgeoftheoorboards
andtheinsideofexternalwalls.
(Detail E)
NOTE: DO NOT FULLY SECURE AS THESE ARE ONLY TO KEEP THE FLOOR SQUARE WHILE BUILDING
THE LOG CABIN.*
• *Forcabinswithinternalparon,theoorboardswillneedtobefullyinstalledatthisstagetoallowparon
baselogstobeinstalled.PleasejumptoStep14fordetails.
E
Step 6:
CONTINUE TO BUILD WALLS
• Usingconstructdiagramasaguide,begintobuildupthewallsbyinterlockingthelogslayerbylayerunl
3logshigh.
• Atthispoint,storeremainingoorboardsinsidethecabinreadyforinstallaon.Youmaynotbeabletot
oorboardsthroughthedooroncecabinhasbeenbuilt.
10
gersheds.com 0113 205 4189 sales@gersheds.com