Pleaseretaininstruconsforfuturereference
Step 13:
ATTACH ROOF FASCIA BOARDS (BARGEBOARDS)
• Aachrooffasciasusing4xN40perfasciaboard.Nailthroughtoppurlinandboomroofbaen.
Completethelookwithnialsoverthejoinatapex.Secureusing2xN40pernial.
NOTE: THERE ARE NO BARGEBOARDS SUPPLIED FOR LOW SIDE OF ROOF AS THIS WILL PREVENT
EFFECTIVE WATER DRAINAGE.
Step 14:
LAY FLOORBOARDS
• Starttolaytheoorboards.Thereshouldbea2.5mmgapbetweentheedgeoftheoorboardsandtheouter
logstoallowforexpansionandcontracon.
• Nailtheoorboardstothetanalisedbearersbelowwith2xBA40evenlyspacedperoorboardper
tanalisedbearer.
• Thelastboardwillneedcungdowntosize.Ifinstallinganyparons,pleasereturntoStep6.
FASCIA FASCIA
FINIAL
15
CUT FLOORBOARD TO SIZE