EasyManua.ls Logo

Tiger RAYNER - Step 2: Double Door Assembly

Tiger RAYNER
20 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Pleaseretaininstruconsforfuturereference
07
Step 2:
DOUBLE DOOR ASSEMBLY
• Forcabinswithdoubledoors,buildupdoorframeusingthefourdoorcomponentsprovided.
Removesuppliedkey.Thisisusuallystapledoverkeyhole.
• Arrangethedoorframingontoarmandlevelsurface,withhingestotheground.Slotthedoorsill(base)
thenthedoorheadintoplace.Securethe4seconstogetherthroughthejointsusing1xS60percorner.
(Detail B)
NOTE: HOLES FOR FRAMING ARE PRE-DRILLED IN THE FACTORY.
NOTE: THIS IMAGE IS FOR ILLUSTRATIVE PURPOSES AND DOOR STYLE MAY DIFFER FROM YOUR
SUPPLIED PRODUCT.
B
DOOR HEAD
DOOR SILL (BASE)
S60

Related product manuals