EasyManua.ls Logo

Tiger TIGERFLEX Elysia - Page 25

Tiger TIGERFLEX Elysia
32 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Please retain instructions for future reference
25
Step 18:
DOOR INSTALLATION
Once external fascias have been tted, offer door up to the opening as shown.
Make sure door is positioned centrally, resting on the last tanalised bearers on the oor within the opening.
NOTE: THERE WILL BE A GAP EITHER SIDE TO ALLOW FOR MOVEMENT OF LOGS.
If door is on side of cabin, rest door on the half log.
Secure the door to the walls using 7x S35 evenly spaced.
Internal fascias can be installed at this point. These are xed to the door frames only. Do not attach to the logs.
(See Step 14 &15 For Reference)
NOTE: DOORS DO NOT HAVE AN INTERNAL LOWER FASCIA.
Ongoing: As timber is a natural product, any log or board can expand and contract. This may cause slight gapping in the log
cabin which can be rectied by un-screwing and re-screwing fascia boards on the doors and windows outlined
in stages 17 & 18 over the course of the year.
S35
S35
S35
S35
S35
S35
S35

Related product manuals