EasyManua.ls Logo

Timeguard SLFM360L - Installation and Connection; Standard Connection - 230 V Mains Installation

Timeguard SLFM360L
12 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
3
4
5. Installation & Connection
Ensure the mains supply is switched off and the circuit supply fuses
are removed or the circuit breaker turned off.
An isolating switch should be installed to enable the power to be
switched ON & OFF for maintenance purposes and to activate the
manual/auto override function.
Remove the wiring cover from the sensor by depressing the catch
on the side and lifting it clear of the twin locators opposite the
catch (See diagram “G”).
Mark the position of the 75mm diameter fixing hole centre taking care
to avoid ceiling joists and other obstructions within the 75mm diameter.
Using a pad saw or suitable hole cutter cut out a 75mm diameter hole
Pass the 230V 50Hz mains supply and load cables through the hole
and prepare for termination.
Terminate the cables into the terminal block ensuring correct polarity
is observed and that all bare conductors are sleeved (See below details
on connection);
THERE ARE 2 POSSIBLE CONNECTION SCENARIOS
Standard connection – 230v Mains Installation
(see diagram “E”)
The factory fitted ‘bridge’ wire must not be removed.
Connect the 3 or 4 core mains supply cable to the block on the unit
as follows:-
NEUTRAL (Blue) N
EARTH (Green/Yellow)
LIVE (Brown) L
Connect the fourth core (lighting live) of the four core cable (if used)
to the L
1
terminal block or the second 3 core cable (from the lighting)
to L
1
(brown), N (blue) and E (green/yellow).

Related product manuals