EN
10
Operation
Preparing for Use
Before rst use, please charge the appliance for 5 hours (refer to “Charging Instructions” for details).
* Based on results from Tineco lab tests. Lab temperature 39.2°F (4°C) ~ 104°F (40°C).
Remove the Clean Water Tank. Open the tank cap, add two bottle caps
of solution.
Fill water to the MAX line and tightly
close the cap.
Put the Clean Water Tank back on the
base.
Carpet
UPH
Use the power brush and aim it at the
stain spot.
Select the Carpet or Upholstery mode
according to different occasions.