Transport / Installation
When transporting the machine, the following key points must be observed:
Do not expose the compressor to impact loads.•
Transport the compressor using a crane, fork-lift truck, lift trolley or similar.•
Use suitable hoisting gear that is appropriate for the load concerned. •
Failure to observe this point could result in damage or injury!
The hoist, cable, chains, etc. must be designed for the load concerned.•
The hoist must be arranged in accordance with the machine‘s centre of gravity.•
The hoist must not be able to exert any forces on the machine that could result in •
damage.
It must be ensured that inadvertent dislocations and harzards due to insufcient •
stability do not occur during transport and installation of the rotary piston machine.
Storage
Prior to delivery, rotary piston machines are treated and packaged to allow for a •
12-month storage period.
If they are to remain in storage following this 12-month period, they will need to be •
retreated and the machine will need to be repacked appropriately;
see storage and mothballing guidelines TN0 1175. .•
During storage, proper preservation, packaging and, if applicable, nitrogen reple-•
nishment must be observed in accordance with TN0 1175. They must be checked
every six weeks.
You must eliminate any adverse inuences immediately in order to ensure ongoing •
preservation.
Intermediate storage in dry, clean rooms that are free of vibrations. •
During storage, no sealing plugs or plastic caps should be removed from bore •
holes, anges, etc. The purpose of these is to prevent any foreign bodies from
entering the machine.
The oil chambers have been sufciently preserved for one year.•
If the machine needs to be stored for longer than 24 months, the entire scope of •
supply must undergo a general inspection by Aerzener trained personnel.
If special packaging is to be used, e.g. for transportation by sea, etc., •
specic storage and mothballing guidelines laid down by Aerzener Maschinenfa-•
brik must be observed.
•
If the machine is to be stored or if the unit is intended to be taken out of operati-•
on for longer than six weeks, the conveying chamber, piston/rotor and bare parts
must be preserved.