Do you have a question about the Tornatech MPA and is the answer not in the manual?
Brand | Tornatech |
---|---|
Model | MPA |
Category | Controller |
Language | English |
Details controller types and methods for starting and stopping the fire pump.
Covers proper placement, mounting, and clearance requirements for the controller.
Specifies water and electrical wiring requirements based on relevant codes.
Details incoming power and motor connection specifications and sizing.
Verifies rating label importance and secure controller installation.
Guides on drilling for connections and installing water input/drain.
Details power/motor connections and verifies motor rotation.
Guides through the "First Setup" and configuring essential parameters.
Explains confirming settings and initiating the download to save reports.
Describes the final steps to complete the controller's first start-up and configuration.
Details the ViZiTouch touchscreen, LEDs, buttons, and connectors.
Explains the alarm bell functionality and the requirement for First Setup.
Describes controller statuses, voltages, currents, motor state, timers, and indicators.
Explains motor status symbols and various causes for motor starting or not running.
Details how the screen saver dims and activates to prolong LCD life.
Covers the alarm list, color codes, silencing, resetting, and table details.
Provides a comprehensive list of potential alarms and their triggers.
Continues the list of system alarms covering various fault conditions.
Lists further alarms related to communication, file system, and pump demand.
Details settings for pressure, units, duration, and access levels.
Explains NumPad usage and the interface for setting date and time.
Covers user login, password entry, and general keypad functionality.
Provides access to timers, sensors, factory settings, and software updates.
Details settings for motor starting, stopping, and transition timers.
Covers timers for various alarms like level, temperature, and flow.
Procedure for calibrating the voltage sensing element using phase voltages.
Procedure for calibrating the current sensing element using ammeter readings.
Details configuring inputs and outputs on the expansion board.
Covers configuring programmable inputs and outputs on the IO Expansion board.
Instructions and warnings for updating the controller software via USB.
Details pre-configured settings for controller operation and alarms.
Explains the parameters and definitions for various factory settings and alarms.
Provides instructions and warnings for resetting the controller to its original configuration.
Covers the service page layout, company info, and pump curve recording.
Details how to schedule service and commit completion.
Guides on creating pump curves and entering data points.
Explains automatic mode and conditions for its disablement.
Details configuration for pressure and water level sensors, including alarms.
Details configuration for flow and spare temperature sensors, including alarms.
Provides important notices regarding analog sensor cable shielding and grounding.
Covers unit selection for sensors and configuring the Flow Start feature.
Explains the different methods for calibrating sensors (0-10V, 4-20mA, Field).
Details the two-point field calibration process for sensors.
Shows the calibration table relating raw, gain, and offset values.
Explains using debug signals and test buttons for IO troubleshooting.
Details troubleshooting expansion board inputs/outputs using signals and test buttons.
Overview of accessing statistics, events, curves, and USB downloads from the History section.
Leads to Events log and USB download pages for data retrieval.
Leads to pages for service, all-time, pressure, power, and pump curves.
Shows the last 500 events and how to retrieve older logs via USB.
Displays the interface for downloading data to a USB device.
Lists downloadable data types: logs, documentation, configuration, pump curves, and statistics.
Details statistics calculated since the first or last service, covering motor and pressure data.
Provides statistics calculated since the controller's initial start-up.
Describes the graphical representation of pressure logs, including axes and indicators.
Explains the tabular view of pressure logs for precise reading.
Describes the graphical representation of power logs, showing voltages and currents.
Explains the tabular view of power logs for precise reading.
Shows the pump curve graph, recording date/time, and navigation controls.
Lists patents related to the controller technology with country and grant numbers.
Checklists for verifying installation, selector switch testing, and initial power-up.
Steps to verify motor rotation and correct any alarms during initial checks.
Report section for completing checks, verifying phase reversal, and motor starts.
Verifying critical field settings like pressure, timers, and weekly tests.
Checks alarm contacts and records overall field acceptance test completion.
Contact details for Tornatech offices in Americas, Europe, Middle East, and Asia.