Installation
Loose Parts
Use the chart below to verify that all parts have been shipped.
Procedure Description
Qty .
Use
1
No parts required
Prepare the machine.
Heater control panel 1
Rotary switch 1
Rotary linear switch 1
Switch nut (7/16 inch)
2
Knob 2
Button-head bolt (5/8 inch)
4
Locknut (#10-24)
4
Control cable
1
2
Wire harness 1
Install the heater control panel.
3
No parts required
Cut the holes for the vents.
Heater box assembly 1
Heater mount bracket 1
Carriage bolt (1/4 x 3/4 inch)
6
Locknut (1/4 inch)
6
Coolant hose (5/8 x 13 inches)
1
Coolant hose (5/8 x 26 inches)
1
V ent hose (2 x 18 inches)
8
Y -adapter 2
Band clamp 2
Cable tie
16
4
V ent 6
Assemble the heater box assembly .
Hex bolt (5/16 x 3/4 inch)
2
Carriage bolt (1/4 x 3/4 inch)
2
5
Locknut (1/4 inch)
2
Install the heater box assembly .
Cable tie
6
Band clamp 2
W ater valve 1
6
Hose 3
Route the hoses.
7
Pan-head bolt (#10-24 x 3/8 inch)
1 Install the wire harness.
8
No parts required
Connect the battery .
9
No parts required
Burp the cooling system.
2