EasyManua.ls Logo

Toro 30344 - Charge Pump Flow Test (Using Tester with Pressure Gauges and Flow Meter) (Machine Serial Numbers below 316000000)

Toro 30344
508 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
ChargePumpFlowTest(UsingTesterWithPressureGaugesand
FlowMeter)(MachineSerialNumbersbelow316000000)
Thechargepumpowtestshouldbeperformedifahydraulicproblemis
identiedthataffectsboththesteeringandliftcircuits.
Note:Thechargepumpprovidesmake-upuidforinternalhydrostat
componentsbeforeowisavailableforthesteeringandliftcircuits.Flow
measuredinthistestwillbelessthantotalchargepumpoutput.
1.Ensurethatthehydraulicuidisatnormaloperatingtemperatureby
operatingthemachineforapproximately10minutes.
2.Parkmachineonalevelsurfacewiththecuttingdeck(orimplement)lowered
andPTOswitchoff.Ensurethattheengineisshutoff.Settheparkingbrake
andblockthefrontwheelstopreventmachinemovement.
3.ReadallWarning,Cautions,andprecautionslistedatthebeginningofthis
section.
CAUTION
Beforeopeninghydraulicsystem,operateallhydrauliccontrolsto
relievesystempressureandavoidinjuryfrompressurizedhydraulic
uid.
g230808
Figure66
1.Hydrostatictransmission
3.O-ring
2.Hydraulichose
4.Outlettting
4.Placeadrainpanunderthetransmission.Cleantheareaaroundthe
transmissionchargepumpoutlet(pressure)tting(Figure66).Disconnect
thehydraulichosefromtheoutlettting.
IMPORTANT
Ensurethattheuidowindicatorarrowontheowmeteris
showingthattheuidwillowfromthepump,throughthetester
andtothehydraulichose.
5.Connectinlethoseoftesterwithpressuregaugesandowmetertothe
transmissionchargepumpoutlet(pressure)tting.Connectthetesteroutlet
hosetothehydraulichosedisconnectedfromthetransmissionttinginstep
5.
Groundsmaster
®
3280-D/3320
Page5–57
HydraulicSystem:TestingtheHydraulicSystem
05138SLRevB

Table of Contents

Other manuals for Toro 30344

Related product manuals