EasyManua.ls Logo

Toro 44536 - Connecting the PTO Shaft; Adjusting the Sway Links

Toro 44536
24 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
5
ConnectingthePTOShaft
NoPartsRequired
Procedure
1.ConnectthePTOshafttotheblower-inputshaft.
2.ConnectthePTOshafttothereartractorPTO
shaft.
3.SlidethePTOshaftfullyforward.
4.DepressthepintosecurethePTOshaftinplace
andslidethePTOshaftbackandforthtoensure
thatitisproperlylocked.
5.Connecttheguardsafetychainsfromthepower
shaftsectionstotheweldedclipsonthelink
armsortothePTOguards(Figure6).
Note:Ensurethatthechainshaveslackwhen
theblowerisraisedorlowered.
g011994
Figure6
1.PTOguard2.Safetychain
WARNING
Iftheguardchainsarenotconnected,they
couldrotateduringoperationandcause
bodilyinjury.
KeepallPTOguardsinplaceandconnectthe
guardchainstothelinkarmsorPTOguards.
6
AdjustingtheSwayLinks
NoPartsRequired
Procedure
Adjusttheswaylinksonthelowerdraftarmsof
the3-pointhitchtominimizeside-to-sideswaytoa
maximumof25mm(1inch)oneachside.
1.Adjustthelowerlinksinboarduntiltheycontact
theblowermountingplates(Figure7).
Note:Thiswillreducethestressonthepins.
Ifthetractorhasswaychainsinsteadofsway
links,installthewashersbetweenthelowerlink
armandlynchpintoreducetheoverhungload
ontheliftpins.
g011995
Figure7
1.Swaylink
2.Linkbody
2.Turntheadjustable-linkbody(ifprovided)to
raiseorlowerthelinkarmuntilthebloweris
leveledfromsidetoside(Figure7).
Note:Refertothetractoroperatorsmanualfor
additionalinstallationandadjustmentprocedures.
8

Related product manuals