EasyManua.ls Logo

Toro CT Series - Completing the Installation; Operation; Using the Beacon; Maintenance

Toro CT Series
4 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
11.Insertacabletiethrougheachofthe2holesinthe
beaconbracket(Figure7),andsecurethecable.
Figure7
1.Holes
12.Onthemaincontrolpanelattherearofthecontrol
pad,removeanddiscardtheblankingplug.
13.Pullouttheswitchconnectorcontaining
orange-red/orangeandblackwiresandpluginthe
switch.
14.Presstheswitchintothecutoutuntilitclicksintoplace
(Figure8).
Figure8
1.Switch
CompletingtheInstallation
1.Installthebulkhead.
2.Applytheseriallabeladjacenttothemachineserial
label.
3.Installthepositive(red)batterycabletothepositive
(+)batteryterminal.
4.Installthenegative(black)groundcabletothenegative
(-)batteryterminal.
5.Lowerandlatchtheenginecover.
Operation
UsingtheBeacon
Toturnonthebeacon,pressthebottomoftheswitch.
Toshutoffthebeacon,pressthetopoftheswitch.
Note:Theignitionswitchmustbeinposition1forthe
beacontowork.
Maintenance
ReplacingtheFuse
Thebeaconfuseislocatedinthemainfuseboxofthe
machine.Itisa10Afuselocatedinthethirdpositionfrom
theright(Figure9).
Toreplacethefuse,removeitbysimplypullingitoutfrom
thefuseblock,andinstallanewfuse.
Important:Alwaysuseafuseofthesametypeand
amperageastheoneyouarereplacing;otherwise,you
coulddamagetheelectricalsystem.
Figure9
1.Fuseblock3.Fuse
2.Cover
3

Related product manuals