Figure15
1.Shortrod
2.Longchutecontrolrod
4.Insertthefrontendoftherodintotheopeningin
thebackofthechutegearcoveruntilitslidesintothe
chutegear(Figure16).
Figure16
5.Aligntheholesinthenestedendsoftherodsand
insert2carriagebolts(intheloosepartsbag)through
theshortrodfromtheleftsideofthemachine(from
theoperatingposition).
6.Insertthecableclipthatsupportsthedeectorcable
ontotheforwardcarriagebolt,andsecurethecarriage
boltswithlocknutsfromtheloosepartsbag(Figure
17).
Figure17
1.Cableclip2.Deectorcable
7.HoldthebluetriggercapdownandrotatetheQuick
Stickinacircletoensurethatthechuteanddeector
operatesmoothly.
5
ConnectingtheHeadlight
andHandWarmerWiretothe
Engine
NoPartsRequired
Procedure
Plugoneconnectorintothestarterwireandanotherinto
theground(Figure18).
Note:Thepigtailsarecolor-coded.
Figure18
1.Starterwireconnector2.Groundconnector
6
FillingtheEnginewithOil
NoPartsRequired
Procedure
Yourmachinecomeswithoilintheenginecrankcase.
Note:Beforestartingtheengine,checktheoilleveland
addoilifnecessary.
11