EasyManua.ls Logo

Toro Sand Pro 5040 - Installing Lift Valve (Model 08705)

Toro Sand Pro 5040
24 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
4
InstallingtheLiftValve
Model08705Only
Partsneededforthisprocedure:
2
StraighthydraulicttingwithO-ring
2
90°hydraulicttingwithO-ring
1
Liftvalve
1Valveplate
3
Bolt(1/4x3inches)
3
Locknut(1/4inch)
2
Bolt(#10x1-1/4inches)
2
Locknut(#10)
1
Liftlever
Procedure
1.Threadboth90°ttingsandthe2straight
hydraulicttingsintothenewliftvalveasshown
inFigure7.
Important:Donottightenthe90°ttings
atthistime.EnsurethatallO-ringsare
lubricatedandproperlypositionedonthe
ttingsbeforeinstallation.
g003663
Figure7
1.Straighttting3.Liftvalve
2.90°tting
2.Mountthevalveassembly,pivotbracket,and
valveplatetotheframewith3bolts(1/4x3
inches)and3locknuts(Figure8).Positionthe
valveplateagainstthefrontoftheframemember
whenmounting,andtorquethefastenersto10
to12N∙m(90to110in-lb).
Note:Thevalveinstallationisverysimilarto
theexistingvalvethatisalreadyinstalled.
3.Looselymountthepivotleverassemblytothe
valvespoolandtotheoffsetlinkwith2bolts
(#10x1-1/4inch)and2locknuts(Figure8).
Note:Donottightenthefastenersatthistime.
g003664
Figure8
1.Valveassembly
4.Offsetlink
2.Pivotbracket5.Pivot
3.Valveplate6.Lever
6

Other manuals for Toro Sand Pro 5040