EasyManua.ls Logo

Toro TS120 - Decommissioning and preparing for winter; WARNING! Electrically activate the solenoid several times so that any residual water is pushed out of the coil cavity.

Toro TS120
24 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
14
7. Decommissioning and preparing for winter
For decommissioning please turn o the water supply and electricity supply of the pump.
During times of possible frost please ensure that there is no standing water in the sprinkler.
e TS120 impact sprinkler has an automatic emptying system.
e sprinkler has a discharge valve and can thus be emptied by gravity. To do this, the water is let out at
the deepest point of the main pipe, as a result of which the sprinkler empties itself. (Deep point emptying)
e remaining water does not any causes in the event of freezing.
WARNING!
Electrically activate the solenoid several times so that any residual water
is pushed out of the coil cavity.
During the winter we recommend activating the coil for approx. 1 minute
twice a week.
For springtime commissioning, see section 6.2.

Related product manuals