G9000 1000kVA OPTIONAL BYPASS FUSE Installation Guide – 92932-001 2
3 OPTIONAL BYPASS FUSE LOCATION
Figure.2 Front view of G9000 UPS with the door and the access panel open
4 INSTALLATION PROCEDURE
Step 1: Turn off the critical load.
Step 2: Turn off the UPS.
Step 3: Remove all power from the UPS. (Open all MCCBs connected to the UPS.)
Step 4: Wait five minutes after removing power from the UPS before opening access panels.
Verify power/energy is not present in the UPS.
Step 5: Open the door of bypass cabinet and the access panel.