EasyManua.ls Logo

Toshiba RAS-M16U2DVG-E - Page 67

Toshiba RAS-M16U2DVG-E
107 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
– 66 –
Heat insulating process
As shown in the figure, cover the flexible hose and hose band with the attached heat insulator up to the bottom of the indoor unit without gap.
Cover the drain pipe seamlessly with a heat insulator locally procured so that it overlaps with the attached heat insulator of the drain connecting section.
10-6. Duct design
Arrangement
Referring to the following dimensions, manufacture duct at the local site.
Indoor unit
Banding band (Locally procured)
Wrap the attached heat insulator seamlessly
from the surface of the indoor unit.
Heat insulator of the
drain connecting
section (Accessory)
Heat insulator
(Locally procured)
* Direct the slits and seams of the heat insulator
upward to avoid water leakage.
A
A A
A
07,10,13 type
16 type
<Under air intake>
<Under air intake>
<Back air intake>
<Back air intake>
A: Some models have no drain guaid here.
<Under air intake> <Back air intake>
22,24 type

Other manuals for Toshiba RAS-M16U2DVG-E

Related product manuals