4 Replacement Procedures 4.26 Fluorescent lamp
4-148 Satellite A40 Maintenance Manual (960-458)
Screw
Screw
(G)
Fit the pin and the hole.
Screw
Fit the pin and the hole.
projection.
Fit the pin and the hole.
Fold the gate board.
Screw tightening torque: 0.9kg
•
cm
Fold the source board.
Check the condition after mating.
*Check the condition of the concave portion of
the FPC and the outline of the connector.
*Insert the FPC to the end. There shall be no
out of position in
θ.
*Lock surely the connector.
Poor mating: Failure
Out-of-position in θ: Failure
Figure 4-147 Replacing 15.0 Inch Sharp fluorescent lamp (SXGA+) (19)