EasyManua.ls Logo

Toshiba SD-2715 - Tools and Fixtures for SVC; Install Process; Deck Mechanism Adjustment

Toshiba SD-2715
78 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
4-5
DECK MECHANISM ADJUSTMENT
1. Tools and Fixtures for SVC
For SVC Program Down-Load
For T-Skew and R-Skew Adjustment
2. Install Process
1. Connect Fig. 1, 2, 3 as Fig. 7.
2. Plug out the Power cord of DVD set.
3. Connect FFC Cable(Fig.2) to the Connector on DVD Set(Fig.8)
4. Connect Printer Cable(Fig.1) to the P.C.Printer Port (LPT1).
5. Plug in the DVD Power cord.
6. Press the Menu key on Remocon.
7. Confirm No.1 LED(RED Color) of Jig board is ON. (Fig.9)
8. Perform The S/W for Down-load at P.C.
9. Open the Program File for Adjusting(Fig.10)
10. Click the Down-load Icon and perform Program Down-load.
11. Displayed remaining time.
12. Confirm LED No.1(RED) and No.2(GREEN) is ON.
13. Plug out the DVD Set Power cord.
14. Disconnect the FFC Cable.
Fig.1. Printer Cable Fig.2. FFC Cable (15 pin) Fig.3. Jig Board
Fig.4. Deviation Disc (0.8mm)
Fig.5. L-Wrench(3mm) Fig.6. RCA Jack Fig.7. Connecting Method
RED
GREEN
RED
Rom Size
File Help
16MBit
8M Bit
LPT1
Manual
LPT2
Port
FILE OPEN
PROGRAM START
PROGRAM EXIT
ROM-DOL
Fig.8. FFC Cable Connecting
Fig.9. Jig Board LED Condition
Fig.10. Adjusting Program File Open

Table of Contents

Other manuals for Toshiba SD-2715

Related product manuals