EasyManuals Logo

Toto EcoPower Series User Manual

Toto EcoPower Series
68 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #8 background imageLoading...
Page #8 background image
INSTALLATION PROCEDURE
White
Battery
TEU1UA(R)(X)
all valves except for
TEU1UA(R)(X)
4. Prior to inserting the Flush Valve tailpiece into
the control stop, make sure that the o-ring is in
the groove at the end of the tailpiece, the
locking nut and the snap ring are located as
shown.
5. Connect the Flush Valve with the control stop
and the vacuum breaker tube. Exercise care not
to damage the o-ring when inserting the
tailpiece into the control stop. If lubrication is
needed, wetting the o-ring with water is
sufficient.
6. Align the Flush Valve and securely tighten
fixture spud nut, vacuum breaker tube nut and
locking nut with a wrench.
7. Connect the battery cable with that of the
controller and set the battery at the proper
position.
8. Connect the cables of the solenoid
valve and generator with those of
controller.
ENGLISH
8
NOTE:
It will take 5 minutes after connecting the
battery for the electronics to initialize.
After approximately 30 seconds, the
sensor LED will flash in 4 second intervals
until the initialization completes.

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Toto EcoPower Series and is the answer not in the manual?

Toto EcoPower Series Specifications

General IconGeneral
TypeToilet
MaterialVitreous China
FinishSedona Beige
SensorYes
InstallationFloor-mounted
Water SavingsYes
Flush Volume1.28 GPF
Water Consumption1.28 GPF
Bowl ShapeElongated
Rough-In Size12 inch
Color OptionsSedona Beige
Warranty1-year limited warranty
ActivationAutomatic (Sensor-activated) or Manual Flush Override
Seat HeightStandard

Related product manuals