EasyManua.ls Logo

Trane Technologies 4WCZ5060E1000A User Manual

Default Icon
32 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Page #1 background imageLoading...
Page #1 background image
SSAAFFEETTYY WWAARRNNIINNGG
Only qualified personnel should install and service the equipment. The installation, starting up, and servicing of heating, ventilating, and air-conditioning
equipment can be hazardous and requires specific knowledge and training. Improperly installed, adjusted or altered equipment by an unqualified person
could result in death or serious injury. When working on the equipment, observe all precautions in the literature and on the tags, stickers, and labels that
are attached to the equipment.
February 2023
1188--BBBB4422DD11--11BB--EENN
Single Packaged Heat Pump, 15 SEER2
Two Stage, Convertible, 2 5 Ton, R-410A
4WCZ5024F1000A
4WCZ5036E1000A
4WCZ5036E3000A
4WCZ5036E4000A
4WCZ5048E1000A
4WCZ5048E3000A
4WCZ5048E4000A
4WCZ5060E1000A
4WCZ5060E3000A
4WCZ5060E4000A
NNoottee:: “Graphics in this document are for representation
only. Actual model may differ in appearance.”
NNoottee:: “Unit specific Service Facts available online.”
Installation and Operations Manual
Question and Answer IconNeed help?

Do you have a question about the Trane Technologies 4WCZ5060E1000A and is the answer not in the manual?

Trane Technologies 4WCZ5060E1000A Specifications

General IconGeneral
Model Number4WCZ5060E1000A
CategoryHeat Pump
Cooling Capacity (BTU/h)60, 000
Heating Capacity (BTU/h)60, 000
SEER Rating16
Voltage (VAC)208/230
Phase1
Refrigerant TypeR-410A
Sound Level (dB)76

Summary

Introduction, Unit Inspection and Specification

Charging in Cooling above 55°F OD Ambient

Instructions for charging the refrigerant system when the outdoor temperature is above 55°F.

Charging Below 55°F OD Ambient

Procedures for charging the system in cooling mode when outdoor ambient is below 55°F.

Unit Installation

Lifting and Rigging

Safety guidelines and procedures for lifting and rigging the unit for installation.

Placing the Unit on the Mounting Curb

Instructions for correctly positioning and setting the unit onto a roof mounting curb.

Ductwork Installation

Electrical Wiring

Power Wiring

Procedures for running power supply lines, using conduit, and connecting to the unit's control box.

Control Wiring (Class II)

Guidelines for routing low voltage control and thermostat wiring, ensuring proper resistance and connections.

Unit Startup

Pre-Start Quick Checklist

A checklist of essential items to verify before starting the unit to ensure proper installation and safety.

Sequence of Operation

Explains the automatic operational cycles for cooling, heating, and supplementary heat.

Demand Defrost Operation

How the unit automatically manages defrost cycles based on outdoor conditions.

Final Installation Checklist

A final review checklist to ensure all installation steps are completed correctly before operation.

Maintenance

Pressure Curves

Refrigerant Circuit

Troubleshooting Chart

Related product manuals