EasyManua.ls Logo

Trane Technologies EERVR100A1P00B User Manual

Trane Technologies EERVR100A1P00B
12 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Page #1 background imageLoading...
Page #1 background image
ALL phases of this installation must comply with NATIONAL, STATE AND LOCAL CODES
IMPORTANT — This Document is customer property and is to remain with this unit. Please return to service information pack
upon completion of work.
HAZARDOUS VOLTAGE - DISCONNECT POWER BEFORE SERVICING
WARNING:
Installer’s Guide
General Information 1
Installation Limitations & Recommendations 1
Unit Installation 2
Installation on a concrete wall 2
Installation on a stud wall 3
Installation on floor joists 3
Installation on roof rafters 3
Duct Connections 6
Electrical Controls 8
Percent Timer Control 8
Push Button Point-of-use Control 9
Checkout Procedure 10
Contents
A. GENERAL INFORMATION
WARNING
!
THIS INFORMATION IS FOR USE BY INDIVIDUALS
HAVING ADEQUATE BACKGROUNDS OF ELECTRICAL
AND MECHANI CAL EXPERIENCE. ANY ATTEMPT TO
REPAIR A CENTRAL AIR CONDITIONING PRODUCT IN-
CLUDING AN ERV MAY RESULT IN PERSONAL INJURY
AND/OR PROPERTY DAMAGE. THE MANUFACTURER
OR SELLER CANNOT BE RESPONSIBLE FOR THE
INTERPRETATION OF THIS INFORMATION, NOR CAN
IT ASSUME ANY LIABILITY IN CONNECTION WITH ITS
USE.
CAUTION
!
To prevent shortening its service life, the ERV should
not be used during the nishing phases of construc-
tion. Compounds used in construction and construc-
tion dust may cause rapid deterioration of the cabi-
net and internal components. To avoid damage keep
drywall spray, construction dust, etc from entering the
air stream of the unit.
These instructions do not cover all variations in systems
or provide for every possible contingency. Should further
information be desired or particular problems arise which
are not covered sufficiently by this manual, contact your
local distributor or the manufacturer as listed on the ERV
nameplate.
BEFORE YOU BEGIN THE INSTALLATION
Check carefully for any shipping damage. This must be
reported to and claims made against the transportation
company immediately. Open carton, remove packing mate-
rial, loose parts and ship-with literature. Check to be sure
all major components are in the unit. Any missing parts
should be reported to your supplier at once, and replaced
with authorized parts only.
18-HE58D1-7
Energy Recovery Ventilator (ERV)
EERVR100A1P00B
EERVR200A1P00B
EERVR300A1P00B
Figure 1
Question and Answer IconNeed help?

Do you have a question about the Trane Technologies EERVR100A1P00B and is the answer not in the manual?

Trane Technologies EERVR100A1P00B Specifications

General IconGeneral
BrandTrane Technologies
ModelEERVR100A1P00B
CategoryFan
LanguageEnglish

Summary

General Information

Unit Installation

ERV Location Considerations

Guidelines for selecting the best ERV location for optimal performance and system balance.

Installation on a Concrete Foundation Wall

Instructions for mounting the ERV unit using a hanging bracket on a concrete wall.

Attic Installation

Installation on Roof Rafters

Methods for mounting the ERV unit directly to roof rafters using appropriate fasteners.

Unit Mounting Positions

Approved Mounting Positions

Details on the acceptable orientations for installing the ERV unit, including hinge placement.

Not an Approved Mounting Position

Warning against installing the ERV in a specific orientation where the door may fall off.

Installation Guidelines

General Guidelines

Key principles for operating the ERV independent of HVAC systems and avoiding issues like humidity increase.

Approved Installations

Describes how to connect ERV ducts to the central system return air for fresh air exchange.

Non Approved / Not Recommended Installations

Explains improper ducting configurations that lead to poor performance or system violations.

Ductwork Installation - ERV to Exterior Wall Outlets

Install Duct Collars

Procedure for attaching duct collars to the ERV's fresh air inlet/outlet and exhaust air inlet/outlet.

Fresh and Exhaust Air Inlet and Outlet Installation

Ductwork Connecting ERV to Indoor Termination Points

Fresh Air Duct Connection to the Cooling and Heating System Return Air Duct

Guidance on connecting the ERV's fresh air supply to the HVAC system's return air duct.

Free Standing Duct System

Instructions for setting up a separate duct system for fresh air distribution within the home.

Electrical Controls

Controls

Overview of the ERV's primary control (PT) and optional push button (PB) controls for ventilation.

Percent Timer Control (PT)

Push Button Point-of-Use Control (Optional Accessory)

Start-Up and Check Out Procedure

Operation - Verifying Unit Performance

Steps to verify the ERV's performance, including airflow checks and balancing.

Measuring Air Flow

Equipment Required

List of necessary tools and equipment for measuring airflow rates, including gauges and tubing.

Cross Core Static Pressure Measurement Instructions

Detailed procedure for measuring differential static pressures to determine airflow rates.

Related product manuals