EasyManua.ls Logo

Trane Technologies THERMO KING V400X - Page 12

Default Icon
72 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
12
TK 62061-18-IM-EN
Unpacking and Unit Inspection
UUnnppaacckkiinngg
1. Open the packaging.
2. Find the unit documentation.
3. Verify that the packaging contains all the accessories indicated on the list attached with the documentation.
4. Check that the hose length is correct before starting the installation. Checking can be carried out by consulting the
“Packing List” included with the unit documentation (1 in = 2.54 cm).
UUnniitt IInnssppeeccttiioonn
1. Open the condenser unit cover and the evaporator unit cover (Spectrum Units only) and check that:
• Neither the cover nor the unit show any shock damage or imperfections.
• The voltage of all the electrical components is correct (12/24V).
2. Open the condenser unit cover and ensure the following:
• The condenser coil is charged with helium gas.
• In electric standby units, the phase used by the unit (1pg or 3ph)that is indicated on the specification plate on the
electric motor.
3. Open the evaporator unit cover and ensure the following:
• The evaporator coil is charged with helium gas.