EasyManua.ls Logo

Trane Technologies THERMO KING V400X - Preparing the es Evaporator for Installation

Default Icon
72 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
22
TK 62061-18-IM-EN
ES Evaporator
Preparing the ES Evaporator for Installation
1. Fit the template according to the instructions given.
2. Mark the position of the drilled holes. Avoid any possible interference with electrical wires and parts of the vehicle
chassis.
3. Drill blind holes to screw the evaporator unit in place. Screw in the bolts and washers supplied for the ceiling. Do
not tighten.
4. Cut the hole to route the moisture drain hose (diameter 22).
5. Install the unit on the ceiling supported by the bolts screwed in previously.
6. Tighten the bolts.