58
TK 62061-18-IM-EN
Completing the Installation
IImmppoorrttaanntt:: BEFORE COMPLETING THE INSTALLATION, YOU MUST PERFORM THE FOLLOWING PROCEDURES IN
ACCORDANCE WITH THE THERMO KING INSTALLATION STANDARDS AND PROCEDURES GUIDE:
• SYSTEM EVACUATION PROCEDURES
• SYSTEM LEAK CHECK PROCEDURES
• SYSTEM CHARGING PROCEDURES
• CONFIGURATION SOFTWARE PROCEDURES
• CONTROLLER PARAMETER SETUP